ROOFTOP pools - The Stainless Steel solution
"Stainless steel pools are becoming a preferred solution for rooftop installations, offering an ideal combination of lightness, durability, and contemporary aesthetics. Their integration with glass and PMMA (polymethyl methacrylate) elements allows for the creation of spectacular aquatic spaces, perfectly suited for urban environments."
Advantages of stainless steel pools for rooftops
-
Lightweight and robust:
Stainless steel is significantly lighter than concrete, reducing structural stress on existing buildings. This feature facilitates the installation of pools on rooftops or terraces, where weight is a critical factor. Additionally, stainless steel offers exceptional resistance to temperature variations and structural movements, ensuring increased longevity. -
Corrosion resistance:
Stainless steel is naturally resistant to corrosion, making it particularly suitable for outdoor environments exposed to the elements. This property ensures uncompromising durability, even in harsh climatic conditions. -
Guaranteed watertightness:
Stainless steel pools offer a unique and durable solution thanks to their inherent watertightness. Unlike traditional materials, stainless steel, by its very nature, is completely impermeable, resisting cracks, degradation caused by structural movements, and water infiltration. This property guarantees a lifetime of watertightness, thus eliminating the need for costly renovations or frequent repairs. For rooftop installations, where safety and durability are essential, stainless steel proves to be a perfect choice, providing peace of mind for owners, architects, and project managers. Steel and Style optimizes each project with sharp technical expertise to guarantee an impeccable result, even in the most demanding environments. -
Minimal maintenance:
The smooth, non-porous surface of stainless steel prevents algae and bacteria from adhering, thus reducing the need for chemicals and frequent cleaning. This translates into simplified maintenance and reduced operating costs.
Technical considerations for installation
-
Structural support:
While stainless steel pools are lighter than their concrete counterparts, a structural evaluation of the building is essential to ensure adequate load-bearing capacity. Close collaboration with structural engineers is recommended to guarantee the safety and stability of the installation.
For rooftop pools, Steel and Style adopts an installation method using incompressible insulation (acoustic resilient), reducing vibrations and improving acoustic comfort. Reinforced waterproofing is then implemented, followed by a load distribution slab, ensuring uniform distribution of the structure's weight. Furthermore, the water height is carefully limited to control load descent on lower floors, thus guaranteeing secure and durable integration in the most demanding environments. -
Thermal and acoustic insulation:
Stainless steel has thermal insulation properties, helping to maintain water temperature. However, additional insulation solutions are necessary to optimize energy efficiency and minimize noise pollution, especially in dense urban environments. -
Waterproofing and finishes:
The quality of welds and joints is crucial to ensure the pool's watertightness. It is imperative to call on professionals specialized in the manufacture and installation of stainless steel pools to guarantee impeccable finishes and optimal durability. At STEEL AND STYLE, all our welds are dye penetrant tested. Dye penetrant inspection is a non-destructive method used to check weld quality. This technique involves applying a penetrating liquid to the weld surface, which seeps into any microscopic cracks or defects. After cleaning, a developer is applied to highlight imperfections. This reliable and precise process is essential to guarantee the structural integrity and perfect watertightness of stainless steel pools and spas, ensuring optimal durability.
On-site installation: hoisting and helicopter lifting, exceptional technical solutions
The on-site installation of stainless steel and glass pools is a crucial step for projects located in complex environments, such as high-rise rooftops. The logistical challenges associated with these installations require advanced techniques, such as hoisting and, in some cases, helicopter lifting. These methods overcome access constraints while ensuring precise and secure placement.
-
Direct on-site installation: a tailor-made approach:
In certain configurations, especially for high-rise buildings or hard-to-reach areas, it is impossible to pre-assemble a pool in the factory and transport it whole. On-site installation then becomes essential. This approach consists of assembling the different modules of the pool, such as stainless steel or glass walls, directly on the rooftop. It requires perfect coordination between manufacturing, installation teams, and specialized lifting service providers. -
Why opt for on-site installation?
- Adaptability: Allows integration on sites with difficult access or specific constraints.
- Flexibility: Prefabricated elements can be adjusted directly on site.
- Precision: On-site control ensures perfect component adjustment.
- Safety: Reduces risks associated with transporting fully assembled modules.
-
Hoisting, the ally of heights:
Hoisting is often preferred for transporting pool elements from the ground to the top of buildings. Large-capacity cranes are used to lift modules, sometimes weighing several tons, and place them precisely in their final location. This method, although spectacular, is meticulously planned taking into account weather, structural constraints, and strict deadlines imposed by the construction site. -
Helicopter lifting, the ultimate solution for extreme sites:
For even more demanding projects, such as areas where crane access is impossible, helicopter lifting is sometimes used. This method involves lifting elements by helicopter and transporting them directly to their final location. Although rare due to its high cost, this solution is ideal for construction sites in isolated or heavily congested urban areas. Helicopter lifting requires meticulous preparation, with ground and air teams working in sync.
Example: the swimming pool of the "Millefiori" tower in Monaco
Steel and Style was selected to design and install a stainless steel and glass swimming pool on top of the Millefiori tower, located in the heart of Monaco. This mirror infinity pool will be assembled on the 34th floor rooftop. Thanks to a perfectly orchestrated lift transportation, the stainless steel and glass modules will be hoisted to a dizzying height, demonstrating complete mastery of technical challenges.
unrivaled expertise
Steel and Style has repeatedly demonstrated its expertise in installing stainless steel and glass pools on high-rise rooftops. Whether by crane or helicopter lifting, each project is carried out with unparalleled precision and rigor. The Millefiori pool in Monaco is an iconic example, illustrating how technical innovation and architectural excellence can combine to transform logistical challenges into spectacular achievements.